Advanced Stream Habitat Survey Data Sheet - Module 2
Stream Name: TERMINAL CREEK Survey Date: 2013-10-07
Organization Name: Bowen Island Fish & Wildlife Club Project Name:
Stream Segment #: Stream Section #:
Data entered by: Berni Claus Survey ID: 20
Step 1 BENCHMARK LOCATION
Directions to Benchmark: Benchmark is located at upstream end of Carter Pond, beside a large Hemlock tree (taped), approximately 30m from Carter Pond Dam.
Step 2 CROSS-SECTIONAL SURVEY
Latitude: 49.00000 Longitude: -123.00000
Location relative to benchmark: 15 m upstream from BM Photos Taken? yes
Bankfull Channel Width: 9.00 Average Bankfull Depth: 31.80
Wetted Channel Width: 6.00 Average Wetted Depth: 6.00
Measurements taken every 1.00 metres Number of measurements taken: 12

First and Last Measurements Taken .1m from the streambank edge

Left Bank 0.10 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0.00 Right Bank
Wetted Depth 0.00 0.00 14.00 0.00 23.00 13.00 15.00 1.00 0.00 0.00 0.00 Wetted Depth
Bankfull Depth 27.00 27.00 47.00 34.00 54.00 45.00 48.00 36.00 0.00 0.00 Bankfull Depth
Step 3 CALCULATE DISCHARGE
Cross-sectional area of wetted stream (m2)
Discharge Wetted Width: 6.600 Discharge Average Depth: 15.000 = 99.000
Average Time (sec)
25.000 21.000 16.000 34.000 17.000 113 22.60
Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Total Trials / 5 Average Time
Average Velocity (sec)
10.000 22.60 0.442
Length (m) Average Time (sec) Average Velocity (m/sec)
Average Stream Discharge (m3/sec)
99.00000 0.44248 x 0.8 3.50442
Cross sectional area (m2) Average velocity (m/sec) correction factor Discharge (m3/sec)